Hi, Folks 👋

I'm

Engineering Costing Admin responsible for inputting COGM data based on the Part List and UMH received from Project Management, preparing New Part Request Forms for Procurement & Vendor Project Management, updating and monitoring similar-part cost estimates, ensuring COGM is calculated correctly and accurately, and compiling the COGM summary; in carrying out these duties, ensures the availability of the latest Part List, UMH, and new similar-part estimates from Project Management, obtains access to open the Pricebook file from Procurement & Vendor Project Management, secures copies of documents A00 and A04/A05 from Document Control, as well as a copy of the draft investment plan document, while also maintaining workplace cleanliness and implementing 5R, and preventing workplace accidents and environmental pollution.

Tubagus Imran

About Me

Profile

Admin Engineering Costing yang bertanggung jawab melakukan penginputan data COGM sesuai Part List dan UMH dari Project Management, membuat Form Request New Part untuk PNP, melakukan update serta monitoring estimasi similar part, memastikan COGM dihitung benar dan akurat, serta menyusun Resume COGM; dalam pelaksanaannya memastikan ketersediaan Part List, UMH, dan estimasi similar part terbaru dari Project Management, memperoleh akses membuka file Pricebook dari PNP, mendapatkan copy dokumen A00 dan A04/A05 dari Document Control, serta copy dokumen draft rencana investasi, sekaligus menjaga kebersihan lingkungan kerja dan penerapan 5R serta mencegah kecelakaan kerja dan pencemaran lingkungan.

Education

2025 Start
Present End
Cikarang Utara, Jawa Barat, Indonesia Location

POLITEKNIK META INDUSTRI

D4 Teknologi Rekayasa Perangkat Lunak • GPA -

2015 Start
2018 End
Bogor, Indonesia Location

MA NEGERI 1 BOGOR

IPA • GPA 82.9

Professional Experience

November 2023 Start
Present End
Bekasi, Indonesia Location

PT. Dharma Electrindo Mfg

Admin Eng Costing • Contract
  • Melakukan penginputan data dan perhitungan COGM berdasarkan Part List dan UMH dari Project Management
  • Membuat Form Request New Part untuk kebutuhan Procurement & Vendor Project Management (PNP)
  • Melakukan update data serta monitoring estimasi similar part agar perhitungan biaya selalu up to date
  • Memastikan perhitungan COGM benar, akurat, dan sesuai referensi data yang berlaku
  • Menyusun Resume COGM sebagai ringkasan biaya produksi untuk kebutuhan pelaporan/koordinasi
  • Menjaga kebersihan area kerja dan menerapkan 5R, serta berperan aktif dalam pencegahan kecelakaan kerja dan pencemaran lingkungan
SAP Costing COGM Analysis Excel (Termasuk pivot table & VBA Excel) Microsoft Word PowerPoint Kerjasama tim Disiplin Problem solving Kreativitas
August 2023 Start
November 2023 End
Bekasi, Indonesia Location

PT. Dharma Electrindo Mfg

Admin Doc Control • Contract
  • Melalukan penerimaan drawing dari marketing dan dokumen dari Project Management (PMWH, PMA, PMPEIS)
  • Meregistrasi drawing dan dokumen sesuai dengan ketentuan yang berlaku
  • Mendistribusikan drawing dan dokumen sesuai dengan ketentuan yang berlaku
  • Menyimpan drawing dan dokumen sesuai dengan standart perusahaan dan customer
  • Menjaga dan menjamin ruang dokumen hanya dapat diakses oleh pihak yang terdaftar pada confidentiality perusahaan
  • Bertanggung jawab menjaga kebersihan lingkungan dan 5R di area kerja dan mencegah kecelakaan kerja serta pencemaran lingkungan
SAP Excel (Termasuk pivot table & VBA Excel) PowerPoint Kerjasama tim
2022 Start
2023 End
Bogor, Indonesia Location

PT. Furnimart Mebelindo Sakti

Staff Admin • Contract
  • Mengontrol keluar masuk barang serta membuat surat jalan dan delivery order.
  • Melakukan input data stok ke dalam sistem inventory (SAP/WMS/Excel).
  • Melakukan stock opname rutin untuk memastikan akurasi data fisik dan sistem.
  • Mengarsipkan dokumen logistik dan surat jalan dengan rapi.
  • Berkoordinasi dengan tim helper dan supir untuk jadwal pengiriman.
Odoo Excel (Termasuk pivot table & VBA Excel) Sales Editing
2021 Start
2022 End
Balaraja, Indonesia Location

PT. Mayora Indah Tbk.

Checker Warehouse (Raw Material) • Contract
  • Mengelola administrasi keluar masuk barang dan inventory.
  • Membuat laporan stok gudang secara berkala.
  • Menginput data penerimaan dan pengiriman barang ke sistem.
  • Mencocokkan data fisik barang dengan catatan sistem (Stock Opname).
  • Berkoordinasi dengan tim logistik untuk pengiriman barang.
WMS SAP Pallet Movers Forklift Inventory Management Supply Chain Management
2020 Start
2021 End
Karawang, Indonesia Location

PT. Mitra Metal Perkasa

Admin Produksi • Contract
  • Menginput data hasil produksi harian ke dalam sistem database.
  • Membuat laporan produksi harian, mingguan, dan bulanan.
  • Memastikan ketersediaan bahan baku untuk kelancaran proses produksi.
  • Berkoordinasi dengan tim gudang dan PPIC terkait jadwal produksi.
  • Mengarsipkan dokumen-dokumen produksi (Surat Jalan, DO, Invoice) dengan rapi.
  • Memonitor stok barang jadi (finish goods) dan barang dalam proses (WIP).
WMS SAP Excel (Termasuk pivot table & VBA Excel)
2018 Start
2020 End
Bogor, Indonesia Location

PT. Sumber Alfaria Trijaya Tbk.

Issuing • Contract
  • Mengecek barang masuk dan keluar
  • Menyiapkan barang untuk distribusi
  • Membuat administrasi pengiriman dan penerimaan barang
Pallet Mover Inventory Management Teamwork

PROFIL PERUSAHAAN

PT. Dharma Electrindo Mfg. Plant 1 Cikarang
PT. Dharma Electrindo Mfg. Plant 2 Cikarang
Karyawan PT. Dharma Electrindo
Manufacturing
Cikarang : 169 Orang
Cirebon : 1660 Orang
Total Keseluruhan : 1829 Orang
TEMA KERJA DEM 2026
"Knowledge & Technology Transformation for Employee Engagement"

.

.

Sejak berdiri pada 14 Agustus 2002, PT Dharma Electrindo Manufacturing merupakan salah satu sub-co dari Dharma Group dan sub holding dari Triputra Group yang bergerak di bidang Manufacturing Automotive (produksi Wiring Harness,Automotive Electronic Parts, Power & Energy Solution, AMR System). Perusahaan ini tidak hanya fokus pada produksi, tetapi juga senantiasa berinovasi dan mengembangkan produk-produk yang berkualitas tinggi untuk memenuhi kebutuhan pasar otomotif yang saat ini terus berkembang.

BISNIS MODEL DEM

Wiring Harness
Wiring Harness 2W and 4W
Automotive Electronic Part
Head Unit, RSE, Antenna, USB Charger, Parking Sensor, Speaker
Power & Energy Solution
Charging Station, Battery Pack, Battery Cell
AMR System
AGV (Automated Guided Vehicle)
Yohanes Susanto
President Director

Struktur Organisasi

  • Y SUSANTO
    BOARD OF DIRECTOR
    President Director
    • LABERTE ANDRI HARYO
      Division Head MPD
      Division
      • ERWAN DWI PRASETYO
        Project Investment Control
        Cost Analyst & Administration
      • AHMAD RIA RAMADHLAN
        Master Material & B.O.M
        Cost Analyst & Administration
      • RINA MERRIANA
        PD Administration
        Cost Analyst & Administration
      • MONICA BA
        Costing Engineering Coordinator
        Cost Analyst & Administration
        • TUBAGUS IMRAN SHIDIQ
          Costing Engineering Admin
          Cost Analyst & Administration
        • HANI HANDAYANI
          Document Control
          Cost Analyst & Administration

Job Description & Activity

Job Descriptions

Admin Doc Control

  • Melalukan penerimaan drawing dari marketing dan dokumen dari Project Management (PMWH, PMA, PMPEIS)
  • Meregistrasi drawing dan dokumen sesuai dengan ketentuan yang berlaku
  • Mendistribusikan drawing dan dokumen sesuai dengan ketentuan yang berlaku
  • Menyimpan drawing dan dokumen sesuai dengan standart perusahaan dan customer
  • Menjaga dan menjamin ruang dokumen hanya dapat diakses oleh pihak yang terdaftar pada confidentiality perusahaan
  • Bertanggung jawab menjaga kebersihan lingkungan dan 5R di area kerja dan mencegah kecelakaan kerja serta pencemaran lingkungan

Admin Eng Costing

  • Melakukan penginputan data dan perhitungan COGM berdasarkan Part List dan UMH dari Project Management
  • Membuat Form Request New Part untuk kebutuhan Procurement & Vendor Project Management (PNP)
  • Melakukan update data serta monitoring estimasi similar part agar perhitungan biaya selalu up to date
  • Memastikan perhitungan COGM benar, akurat, dan sesuai referensi data yang berlaku
  • Menyusun Resume COGM sebagai ringkasan biaya produksi untuk kebutuhan pelaporan/koordinasi
  • Menjaga kebersihan area kerja dan menerapkan 5R, serta berperan aktif dalam pencegahan kecelakaan kerja dan pencemaran lingkungan

Activity Jobs

Agu 2023 – Okt 2023 3 Bulan

Admin Doc Control

Admin Doc Control
Okt 2023 – Sekarang 2 Tahun 9 Bulan

Admin Eng Costing

Admin Eng Costing
Jan 2024 – Des 2025 2 Tahun

Addtitional Job

Addtitional Job
×

Aktivitas Kepanitiaan

2025
Culture Day 2025

Culture Day 2025

Peserta

Juara 1 Cerdas Cermat

22 Dec 2025
Family Gathering DEM 2025

Family Gathering DEM 2025

Konsumsi
27 Sep 2025
HUT DEM Ke 23

HUT DEM Ke 23

Konsumsi
14 Aug 2025
Family Gathering Engineering

Family Gathering Engineering

Bendahara
30 May 2025 - 31 May 2025
2024
Culture Day 2024

Culture Day 2024

Peserta
20 Dec 2024
Family Gathering DEM 2024

Family Gathering DEM 2024

Pic Bus
28 Sep 2024
×

Aspirasi Karir

Visi Masa Depan

I want to develop from an Engineering Costing Admin to a Costing/Cost Analyst function leader who is able to build a Product Life Cycle (PLC) based costing and analytics system to measure long-term growth in 4 business categories (Wiring Harness, Automotive Electronics Parts, Power & Energy Solution, and AMR System), including preparing costing model adjustments for new categories (Power & Energy Solution and AMR System) so that business decisions are faster, more accurate, and data-driven.
Ilustrasi Aspirasi

Milestones

2023 - 2026

Admin Engineering Costing

  • Menstandarkan input dan kontrol akurasi COGM (Part List, UMH, similar part, pricebook) lintas proyek. - Menyusun “data foundation” untuk 4 kategori: struktur master data, template costing, dan aturan dokumen pendukung. - Kontribusi awal ke analitik: rekap biaya per kategori dan tren dasar (biaya material, UMH, perubahan estimasi).
2026 - 2028

Staff Costing

  • Melakukan penginputan data untuk COGM sesuai dengan Part List dan UMH dari Project Management- Membuat Form Request New Part untuk Procurement & Vendor Project Management- Melakukan update data dan monitoring estimasi similar part - Menjamin COGM telah dihitung benar dan akurat- Membuat Resume COGM- Bertanggung jawab menjaga kebersihan lingkungan dan 5R di area kerja dan mencegah kecelakaan kerja serta pencemaran lingkungan
2028 - 2030

Costing Engineering Coordinator

  • Memimpin koordinasi costing lintas fungsi untuk 4 kategori bisnis dan menetapkan quality gate (review, audit formula, traceability).- Membuat prototype sistem/program (mis. Excel automation / database sederhana / dashboard) untuk: - perhitungan COGM konsisten, - monitoring similar part, - kontrol revisi pricebook, - reporting biaya per kategori.- Mulai kerangka Product Life Cycle costing: definisi parameter Product Life Cycle per kategori (indikator growth, volume, biaya, margin, learning curve).
2030 - 2032

Section Head Cost Analyst

  • Mengelola tim dan KPI (akurasi, lead time, compliance) serta memastikan costing berjalan stabil untuk semua kategori.- Mengembangkan sistem menjadi aplikasi internal/alat analitik yang lebih terintegrasi (workflow input–validasi–approval–report).- Menguatkan model untuk kategori baru (Power & Energy Solution & AMR System): penyesuaian struktur BoM, cost driver, dan asumsi standar (karena karakteristiknya masih berkembang).

Manufacturing, Digitalization & Automation Strategy

3

Long Term Strategy

MANUFACTURING :

  • Menjadikan analisis biaya sebagai alat pengambilan keputusan strategis: prioritas efisiensi, standardisasi desain, dan strategi penurunan biaya per kategori.
  • Mengintegrasikan rekomendasi costing dengan program peningkatan produktivitas (penurunan Unit Man Hour, pengurangan waste, dan stabilisasi proses)
  • Membuat peta kematangan Product Life Cycle per kategori untuk menentukan strategi produksi jangka panjang (scale-up, stabilisasi, atau transformasi produk/proses).
2

Middle Term Strategy

MANUFACTURING :

  • Membangun model costing per kategori berbasis proses (process-based costing) untuk melihat kontribusi biaya per proses/aktivitas.
  • Mengembangkan analisis kurva pembelajaran: tren penurunan Unit Man Hour, scrap/rework, serta stabilitas proses untuk memproyeksikan penurunan biaya.
  • Membuat model costing yang disesuaikan untuk kategori baru (Power & Energy Solution dan AMR System) karena karakteristik produk dan prosesnya masih berkembang.

DIGITALIZATION & AUTOMATION :

  • Membuat sistem/aplikasi semi-otomatis untuk perhitungan COGM, monitoring similar part, dan kontrol revisi pricebook (mengurangi pekerjaan manual dan error).
  • Membangun dashboard per kategori berisi tren volume, biaya per unit, margin, serta indikator Product Life Cycle secara periodik.
  • Menetapkan kerangka Product Life Cycle per kategori: parameter pertumbuhan, volume, biaya, margin, dan kurva pembelajaran beserta metode pengukurannya.
  • Menerapkan quality gate (input–validasi–finalisasi–resume) dan audit berkala sebagai standar kontrol mutu costing.
1

Short Term Strategy

MANUFACTURING :

  • Menetapkan baseline biaya produksi per kategori (material utama, Unit Man Hour dominan, overhead) sebagai acuan kontrol biaya.
  • Menyusun standar evaluasi similar part untuk mempercepat estimasi dan menjaga konsistensi perhitungan.

DIGITALIZATION & AUTOMATION :

  • Menstandarkan proses input COGM (format Part List, Unit Man Hour, similar part, referensi pricebook) agar konsisten lintas proyek.
  • Membuat checklist validasi akurasi COGM (kontrol formula, kontrol revisi dokumen A00/A04/A05, dan keterlacakan data).
  • Membentuk struktur master data per kategori bisnis (kode part, klasifikasi, mapping dokumen, dan struktur cost driver).
  • Menyusun format Resume COGM yang seragam untuk koordinasi dan pelaporan yang cepat
  • Mengembangkan sistem menjadi platform costing-analytics terintegrasi lintas fungsi (Project Management–Procurement–Finance) sebagai single source of truth.
  • Mengimplementasikan analitik prediktif untuk proyeksi biaya dan margin berdasarkan volume, tren harga, kurva pembelajaran, dan perubahan teknologi.
  • Membangun governance data jangka panjang (master data, version control, audit trail) agar perhitungan dan keputusan selalu dapat ditelusuri.
  • Menyediakan dashboard eksekutif untuk memantau pertumbuhan jangka panjang setiap kategori bisnis berbasis Product Life Cycle.

Obstacle & Challenge

Obstacles

Data input tidak lengkap atau berubah-ubah

(Part List, UMH, estimasi similar part) sehingga perhitungan COGM sering revisi.

Akses dan konsistensi referensi harga

(pricebook) terbatas atau update tidak seragam antar proyek/vendor.

Kontrol revisi dokumen

(A00, A04/A05, draft investasi) kurang rapi sehingga berisiko salah versi saat menghitung.

Banyak aktivitas masih manual

Format dan struktur data berbeda antar kategori bisnis

  • (copy-paste, dokumen excel, rekap) sehingga rawan human error dan memakan waktu.

Challenges

Membangun standard costing lintas proyek dan lintas kategori

tanpa mengurangi fleksibilitas kebutuhan masing-masing proyek.

Menyusun costing model untuk kategori baru

(Power & Energy Solution dan AMR System) yang masih berkembang

Menciptakan sistem atau aplikasi

yang mengurangi pekerjaan manual, mempercepat proses, dan meningkatkan akurasi (termasuk kontrol revisi dan audit trail).

Menerapkan kerangka Product Life Cycle

untuk mengukur pertumbuhan jangka panjang tiap kategori, yang membutuhkan data historis rapi dan definisi parameter yang konsisten.

Menjaga keseimbangan antara kecepatan dan kualitas

tuntutan deadline tinggi, namun akurasi dan dokumentasi tetap wajib kuat.

Tech Stack That I Use

JavaScript
PHP
Python
React
Vue.js
Laravel
Node.js
Tailwind
Docker
MySQL

Additional Information

Technical Skills

  • Web Development : HTML, CSS, JavaScript, PHP, LARAVEL
  • Networking & System : Microtic Configuration, Linux Debian, LAN/WAN Setup, Computer Troubleshooting
  • Hardware & Software Maintenance : Perakitan dan instalasi hardware maupun software
  • Database Management : MySQL, phpMyAdmin
  • Office & Productivity Tools : Microsoft Word, Excel (Termasuk pivot table & VBA Excel), PowerPoint
  • Tools & Software : Visual Studio Code, Git, XAMPP, Postman, Laragon, WMS, SAP, Odoo
  • Operational & Logistics : Costing, COGM Analysis, Inventory Management, Supply Chain Management, Forklift, Pallet Movers

Soft Skills

  • Komunikasi dan presentasi yang efektif
  • Kerjasama tim
  • Teliti
  • Disiplin
  • Kreativitas
  • Problem solving
  • Manajemen Waktu
  • Pengetahuan dasar tentang ISO 9001, ISO 14001, ISO 45001, HACCP, dan IATF 16949.